Scheduled Maintenance Notice: UPS 1A Annual Maintenance at BR1

Scheduled for Jun 16, 07:30 - 17:00 AEST

Scheduled

Change Reference: CHG0085759

Location: Equinix BR1



Date & Time (Local): Monday, 16 June 2025, 07:30 – 17:00 AEST

Tuesday, 17 June 2025, 07:30 – 17:00 AEST

Date & Time (UTC): Sunday, 15 June 2025, 21:30 – Monday, 16 June 2025, 07:00 UTC

Monday, 16 June 2025, 21:30 – Tuesday, 17 June 2025, 07:00 UTC



🛠 Maintenance Overview

Equinix will be performing annual maintenance on the UPS 1A system at BR1. During this work, the A feed will be placed in maintenance bypass mode and supported by generator, while the B feed will remain UPS-backed.



During these works customer IT equipment will continue to have two diverse sources.



🔧 Expected Impact



  • Power:

    • Loads will be transferred to generator power

    • UPS loads will be transferred to an unprotected source

    • System redundancy will be reduced



  • Cooling: Redundancy will be maintained



📞 Contact and Support

For any questions, contact support and quote CHG0085759.

Posted May 13, 2025 - 09:20 AEST
This scheduled maintenance affects: Regions (Brisbane) and Data Centres (Equinix BR1).