Power Maintenance - Equinix BR1
Scheduled Maintenance Report for Servers Australia
Completed
The scheduled maintenance has been completed.
Posted Jan 19, 2022 - 10:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 19, 2022 - 06:00 AEDT
Scheduled
During the times listed in this maintenance, the Equinix BR1 IBX team will conduct power maintenance on PDUs in the facility. Please see the details for these works below:

- Isolate PDU-L1-2A for a 1hr window
- Re-energise
- Once confirmed that all is up and running from PDU-L1-2A, PDU-L1-2B will proceed as above.
- Affected racks will only lose one feed at a time.

There will be no impact to services with dual power feed as the load will be supported by either one of Uninterruptible Power Supply (UPS) source. For equipment with single power feed, to avoid service interruption, it is recommended that the equipment shall be powered off or connected to another source before the power down and fall back afterward.

This maintenance will affect the below racks:
BR1:02:040110:501
BR1:02:040110:502
BR1:02:040110:503
BR1:02:040110:504
BR1:02:040110:505
BR1:02:040110:506
BR1:02:040110:507
BR1:02:040110:508
BR1:02:040110:509
BR1:02:040110:510
BR1:02:040110:511
BR1:02:040110:512
BR1:02:040110:513-B
BR1:02:040110:514-B
BR1:02:040110:515-B
BR1:02:040110:601
BR1:02:040110:602
BR1:02:040110:603
BR1:02:040110:606
BR1:02:040110:607
BR1:02:040110:608
BR1:02:040110:609
BR1:02:040110:610
BR1:02:040110:611
BR1:02:040110:612
BR1:02:040110:613
BR1:02:040110:614
BR1:02:040110:615
BR1:02:040110:616
BR1:02:040240:1013
BR1:02:040240:911
BR1:02:040240:912
BR1:02:040240:1011
BR1:02:040240:1012

Please contact our support team should you have questions relating to this maintenance.
Posted Jan 07, 2022 - 13:37 AEDT
This scheduled maintenance affected: Regions (Brisbane), Data Centres (Equinix BR1), and Services (Colocation).