PE2 Perth IBX - Reduced redundancy MSB Power Quality Meter Install
Scheduled Maintenance Report for Servers Australia
Completed
The scheduled maintenance has been completed.
Posted May 19, 2022 - 20:00 AEST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 19, 2022 - 08:01 AEST
Scheduled
Equinix has engaged Manufacturers to install additional Power Quality Meter equipment at PE2 which will be integrated into the existing infrastructure.

To install Power Quality Meter equipment into the Main Switch Board, Transformer 1-1 will be isolated and customer loads will be transferred to the generator power supply.

While no downtime is expected, we are operating at a reduced level of redundancy during these works.

Please reach out to our support team via a Support Case or by calling our support team on 1300 788 862.

IBX LOCAL TIME: THURSDAY, 19 MAY 06:00 - THURSDAY, 19 MAY 18:00
Posted Apr 13, 2022 - 07:58 AEST
This scheduled maintenance affected: Services (Network, Dedicated Servers, Colocation), Regions (Perth), and Data Centres (Equinix PE2).